Projecten ‘Waterberg’ node A50-A12-success

In the territory of the state of water fun, more Roadled ® traffic going in a good look of the button `Projecten water boarded point A50-A12
In the past month, the road Apeldoorn – Utrecht, Utrecht and roadled ® obstacles.

roadled-barrier-1

ROADLED BARRIER

The purpose is to improve the visibility of the road, so the increase in traffic, without the usual high investment and operating costs associated with ALS OVL.

Consultant Mr. Everaars Slow motion (in Infraproviding East Netherlands) and (traffic and transport consultant region Arnhem Nijmegen), on behalf of the assembly is present. They are also closely involved in the preparation phase of this Roadled ® Projecten. This method is good preparation and a clear plan to lead to huge results demonstrate the success of the implementation.

Improve road safety awareness, no high investment or operating costs

Mr. Hendriks transportation and more, take a roadled ® device correctly assembled itself, “as the top barrier packaging and custom lighting, plus the lack of any underground infrastructure roadled’s ® exclusive technology is the assembly time is short.

Roadled_top_1

ROADLED TOP

roadled®

Barrier is connected to the top of the rail and roadled ® is a roadside stand installation, “said Mr. Hendricks.

Parties are looking forward to the next junction where the gray version also roadled ® jacket and barriers will be placed.